HDC completed the CAD drawings of the plans and elevations for the exterior repairs of the Kentucky Capitol Annex building in Frankfurt. HDC is a consultant to THP Limited, Inc. who requested that we draw every block of limestone on the elevations. HDC’s John Creasy was up to the challenge, having previously prepared elevation drawings of the former Sears Department Store in Cincinnati, where THP requested that we draw every single brick! John said the Annex building was pretty tricky, with several wall areas hidden behind balustrades or in courtyards.