HDC Welcomes Back Vivian Majtenyi!

The void left by the passing of Cathie Senter was thankfully filled by the return of Vivian Majtenyi in March. Vivian worked for HDC from 1999 (we were her first full-time architecture position) until 2013, when she left to take a break after working almost non-stop on our signature projects. During her 14 years at HDC, she traveled the country to complete facility assessments on Air Force Materiel Command installations and conduct research and documentation of historic buildings on navy bases. Vivian worked with Charissa Durst on the initial fieldwork at the Woodward Opera House through the rehabilitation of the second floor. She was also the project coordinator for both the addition to and renovation of the Lincoln Theatre and the addition and renovation of Stewart Elementary School. Vivian also obtained her architecture license in 2011. In the 10 years since she left HDC, her diverse work experience included the in-house design department of a construction firm, a large (over 650 employees) full-service A/E firm, and researching and writing historic architectural reports for cultural resources projects. Since HDC started new projects with the City of Columbus and State of Ohio this year, we are very happy to have Vivian back!
  
Left: Vivian leading a tour of the Lincoln Theatre. Right: Vivian’s celebratory cake upon passing the architecture license exam.